cms_WY: 93
Data source: Big Local News · About: big-local-datasette
rowid | facility_name | facility_id | address | city | state | zip | inspection_date | deficiency_tag | scope_severity | complaint | standard | eventid | inspection_text | filedate |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
93 | BONNIE BLUEJACKET MEMORIAL NURSING HOME | 535019 | 388 SOUTH US HWY 20 | BASIN | WY | 82410 | 2017-04-06 | 253 | E | 0 | 1 | 508H11 | Based on observation and staff interview, the facility failed to ensure 2 of 2 resident areas (100 hall, 200 hall) were clean and in good repair. The findings were: 1. Observations of the 100 hall beginning on 4/4/17 at 2:53 PM showed the following maintenance and housekeeping concerns: a. In the bathroom of room #101 the lower 7 inches on the door frames had chipped off paint exposing underlying material, which created a surface that could not be cleaned effectively. b. In room #104 the lower 12 inches of the door frame was damaged exposed underlying material which created a surface that could not be cleaned effectively. c. In room #109 the lower 23 inches of the door frame had chipped-off paint with exposed underlying material which created a surface that could not be cleaned effectively. d. In the toilet room next to the shower room the right side of the cabinet had 17 inches of broken trim which created a surface that could not be cleaned effectively. e. The entry to the 100 hall had three 4 foot by 2 foot ceiling tiles with black spots and holes in them. Two of the tiles also had small water spots on them. To the right by the wall there was a ceiling tile that had multiple cracks through it. f. The entry to the 100 hall had a 4 foot privacy wall with 3 spots with wallpaper peeled off. 2. Observation of the 200 hall beginning on 4/3/17 at 5:09 PM showed the following maintenance and housekeeping concerns: a. In room #205 in front of the bathroom the ceiling tile was cracked. b. The door frame at room #201 had chipped-off paint at the lower 12 inches that exposed underlying material which created a surface that could not be cleaned effectively. 3. Interview on 4/6/17 at 8:25 AM with the maintenance supervisor confirmed the identified areas needed to be fixed. | 2020-09-01 |